Your choice is to roll out the proven scope, narrow it, extend the pilot to answer a specific question, or stop. Make that call from observed results, operating work, and remaining risks.

Key takeaways

  • Decide from observed findings: connect each unresolved issue to a workflow, owner, and proposed next step.
  • Separate blockers from improvements: required access and data controls must pass before release.
  • Extend only for a testable question: a further experiment needs a bounded scope and a decision it can change.

Reconcile the original scope with the work completed

Compare the agreed workflow, source set, users, configuration, and acceptance criteria with what the team tested. Record scope changes and mark untested requirements as gaps, not passes. The Australian Centre for Evaluation's pilot guidance offers broader context; keep the closeout specific to this project's data, users, and decision.


Give every finding a decision consequence

FindingExample next decision to define
Accepted source is retrieved and correctly citedPreserve that tested path as a candidate release scope
Required access boundary failsResolve the boundary and retest before the affected scope advances
One document format remains unreliableNarrow the initial supported corpus or run a focused processing test
Retrieval passes but an agent action is unresolvedRelease the read-only scope if approved, and keep the action separate
Operating effort exceeds the planned capacityChange the operating arrangement or revise the release scope
Evidence is insufficientCommission a bounded test only when its result can change the decision

Set the actual consequence with the accountable owner. The examples illustrate a decision record and do not replace an organization's security, procurement, or release requirements.


Reconcile cost with accepted outcomes

Use actual pilot usage and operating work to estimate the next scope. For each stated period and scope, calculate cost per accepted outcome = attributable cost for that period and scope ÷ accepted outcomes in that same period and scope. Define acceptance criteria before counting outcomes. Include failed and retried work, plus review and rework, in attributable cost. Report one-time setup separately from recurring run cost. Break out supplier charges, infrastructure, external models or tools, and staff effort. Record assumptions that change with a larger corpus, more users, or more frequent updates.

Keep each accepted task and its cost together; a total question count can hide answers that needed correction.


Keep an integrated-platform decision concrete

For a candidate such as Seahorse Cloud, ask: did connecting document processing, synchronization, retrieval, and agents reduce the work the team had to do? Use the findings to identify which customer-side duties remain.

Confirm hosting location, subscription or installation terms, support, and operating responsibilities in the selected proposal. Check current official pricing in its published currency when estimating costs. Rely on quoted terms; a pilot creates no unquoted SLA, certification, or capacity commitment.


Choose expand, narrow, extend, or stop

  • Expand: Roll out the tested configuration within the approved scope. Validate changes before adding new users, data, or load.
  • Narrow: Release a useful subset when its boundaries are clear.
  • Extend: Test a named unresolved question with an owner, permitted budget, finish condition, and a result that could change the decision.
  • Stop: Stop when no approved practical test can resolve the remaining requirement. Assign closure and billing owners, and document the approved handoff of data and access.

Record the decision, its owner, and the evidence supporting it.